No Nama Peserta K Skor
Kualifkasi
Skor
Pembuktian
B A T Skor
Teknis
Penawaran Penawaran Terkoreksi Hasil Negosiasi H Skor
Harga
Skor
Akhir
P PK Alasan
1 CV. PRIMA RANCANG - 01.975.189.0-121.000 90.0 90.0 73.4 Rp 198.141.020,00 Rp 198.141.020,00 Rp 198.141.000,00 78.72 78.72
2 GADING MAS - 76.387.657.0-121.000
3 PT. BINA MITRA ARTANAMI - 01.974.661.9-122.000
4 PT CIPTA YASA GLOBAL - 42.027.684.2-125.000
5 PT. Arangsibu Raya Consultant - 01.532.193.8-122.000
6 Cv. Adillah Engineering Consultant - 31.363.403.2-121.000
7 PT. IRBIE NUSA KONSULTAN - 85.224.876.4-122.000 69.0 Tidak Lulus Nilai ambang batas total minimal
8 CV. RAJAWALI ENGINEERING CONSULTANT - 83.910.198.7-124.000
9 CV. MARCO LOUIS - 80.832.174.9-127.000
10 CV. CIKAS NUSANTARA - 02.199.669.9-124.000
11 CV. Bisma Kasada - 01.699.642.3-121.000 90.0 90.0
12 PT. BUMI TORAN KENCANA - 01.763.460.1-121.000 75.0 75.0 Tidak Hadir pada jadwal pembuktian kualifikasi
13 cv. khalimal consultant - 02.591.076.1-124.000
14 PT. MATARAM SURYA CIPTA - 31.518.565.2-122.000 69.0 Tidak Lulus Nilai ambang batas total minimal
15 CV. DWI PUTERA ADIYASA - 76.036.284.8-113.000 77.81 77.81 66.74 Tidak memenuhi ambang batas nilai teknis "70"
16 CV. PRESISI TAMA - 21.044.824.7-122.000 85.0 - Tidak Melampirkan Sertifikat kepesertaan BPJS ketenagakerjaan - Tidak Melampirkan Bukti pembayaran Iuran BPJS bulan terakhir